Facade Repair in Špindlerův Mlýn
We contributed to the reconstruction of the concrete panel facade of the Harmony Hotel in Špindlerův Mlýn by providing specialized equipment for working at height and precise handling of heavy elements.
For the project implementation, we supplied an articulated boom lift with a reach of 26 meters and a UNIC 1006 mini crane with a reach of up to 30 meters. The combination of these machines enables the contractor to work safely and efficiently even on a complex and extensive structure where access from the surrounding terrain is significantly limited. Thanks to the carefully selected technical parameters, it is possible to position workers and materials precisely where they are needed and to proceed smoothly with the installation of individual facade panels without unnecessary downtime. Even on technically demanding projects, we seek solutions tailored to the specific conditions on site – the right machine, the right reach, and equipment prepared for the work.